Cerebras Mikkeli AI data centre locks 165MW
Cerebras and Compute Nordic Finland will build a 165 MW AI data centre in Mikkeli, with 50 MW under construction under seven-year contracts.

Visual TL;DR
sustained appetite for wafer-scale AI training and inference capacity
From the articleCompute Nordic Finland CEO Pyry Virrantaus called it contractually committed demand rather than a bet.
waste thermal energy piped to nearby buildings, designed in from day one
From the articleHeat reuse is designed in from the start, so waste thermal energy can feed the surrounding community.
Ramboll estimates EUR 1.0 to 1.7 billion investment and 80 to 250 permanent jobs
From the article 3 mentionsThe Cerebras Mikkeli AI data centre is a 165 MW phased build in Finland, and construction on the first 50 MW is already under way.
seven-year service orders lock capacity, removing speculative build risk
sustained appetite for wafer-scale AI training and inference capacity
From the articleCompute Nordic Finland CEO Pyry Virrantaus called it contractually committed demand rather than a bet.
From the article 3 mentionsThe Cerebras Mikkeli AI data centre is a 165 MW phased build in Finland, and construction on the first 50 MW is already under way.
seven-year service orders lock capacity, removing speculative build risk
denser AI output per megawatt using Cerebras chip packaging technology
From the articleCerebras Systems says its wafer-scale architecture pulls more AI output per megawatt, and Mikkeli pairs that with closed-loop cooling that recirculates water.
water recirculated on site to cut fresh-water draw at the Mikkeli site
From the articleCerebras Systems says its wafer-scale architecture pulls more AI output per megawatt, and Mikkeli pairs that with closed-loop cooling that recirculates water.
waste thermal energy piped to nearby buildings, designed in from day one
From the articleHeat reuse is designed in from the start, so waste thermal energy can feed the surrounding community.
50 MW, then 80 MW, then 165 MW delivered sequentially over multiple phases
From the articleCapacity scales 50 MW, then 80 MW, then 165 MW as it's delivered.
Ramboll estimates EUR 1.0 to 1.7 billion investment and 80 to 250 permanent jobs
© 2026 StartupHub.ai. All rights reserved. You may not republish this article in full without a license. Search engines and AI research tools may crawl and summarize for reference. Bulk reproduction or model training requires a license. See our terms.
Watch
The videos behind the news, one flip at a time
The feed mixes the videos from our articles with startup demos and you flip through them like TV channels for free with no signup.
Written by
Daniel SingerEditor, StartupHub.ai
Daniel Singer is the editor of StartupHub.ai, a technology expert and thought leader on AI and its applications across sectors, from fintech and healthcare to developer tooling and consumer software. He writes and tests the tools covered here thoroughly and regularly, and built StartupHub.ai to give founders, operators and buyers a clearer read on what they are actually being sold.


